Charles Sturt University - 4.4MW Multi Site Solar Rollout

After finishing a 6,000-panel system at the Wagga Wagga campus in 2016, CSU contracted Todae Solar to design and install 4.4MW multi-site rollout across 17 buildings. Now, this multi-site installation is one of Australia’s largest rooftop solar power systems. It is expected to produce 2,700,000kW in its first year; thereby reducing the University’s green gas emissions by 2,513 tonnes what is a good step forward by keep an eye on reducing their carbon footprint. The project was finished in late 2017 and a third solar power system of 2.6MW were installed in 2018.

  • System Size
    4.4MW

  • Approximate First Years Output
    2,700 MWh