Established in 1984, Prime Motion & Control is Australia’s leading supplier and manufacturer of hydraulic components and equipment for all fluid power applications.
In December 2015 Prime Motion & Control contracted Todae Solar to install a 100kW commercial solar system on top of their building in Malaga, WA. 50% of their electricity bill will now be covered by sustainable energy and 137 tonnes of carbon will be abated every year.
System Size
100KW
Approximate Yearly Output
145,000kWh
Approximate Bill Coverage
50%
© Copyright 2024 Todae Solar. All rights reserved